Custom pools · Valley of the Sun

Backyards
Worth
Coming
Home
To.

From plunge pools to full resort backyards, one local crew handles every step across the Valley, start to finish, for one agreed number.

Modern pool at dusk beside a desert-style backyard
Close-up of pool edge and stone deck

94%

done by the promised date

4.8

on Google

12

years in the Valley

300+

pools built

01 / Who we are

Every pool

Sunlit pool water close-up

starts as

A sketch

Glass waterline tile

and ends with

A

Pool deck edge

cannonball.

One team draws it, digs it and finishes it, so the pool you approve on paper is the pool in your backyard, built for the price on page one.

Crew working on a pool build

One team

The same people who draw your pool dig it, plumb it and finish it. One contract, one point of contact.

Architectural plans on a table

Locked price

Every line item is priced in writing. Surprises need your OK before they’re billed.

Pool filling with water

Friday recap

Photos from the week, what’s next, and anything we need from you, in your inbox before the weekend.

02 / Pools we build

Five ways
to cool off

Move across the list to preview each build. Everything here is designed, dug and finished by our own crew.

01

Custom pools

Geometric, freeform and resort-style. Typically 10–12 weeks.

02

Plunge pools & spas

Compact pools and spas for tight yards. Typically 6–8 weeks.

03

Infinity edge

Vanishing edges and Baja shelves. Typically 14–16 weeks.

04

Remodels & resurfacing

Re-plaster, retile, re-equip. Typically 3–4 weeks.

05

Outdoor living

Ramadas, decks, fire features and misters. Typically 4–6 weeks.

03 / Before & after

Before: dirt.
After: dive in.

BeforeAfterBuilt in 11 weeks
Slide
04 / Finishes
Pebble
Pebble
Interior finish

Pebble, built for 115° days

Polished pebble aggregate that stays smooth underfoot and keeps its color through 115° summers and years of sun.

Polished aggregateHeat tolerantLow maintenance
05 / How it works

First call,
first swim.

0
Week 1

Walk the yard

A designer and a builder walk your yard with you, checking slope, soil, setbacks and utility lines before a single line is drawn.

No charge60 minutesUtility locate

06 / Budget

What will it
actually cost?

Choose a pool style to see typical pricing and timelines for a Phoenix backyard. Your consultation turns that range into an exact number.

300+

Pools built

94%

Done by the promised date

4.8

From 210 Google reviews

Typical price
Typical timeline
Classic: typical price $85,000, typical timeline 10 weeks.

Ballpark only, based on recent Phoenix projects. Not a quote. Your consultation gives the real number.

07 / Get started

Pick a time,
we’ll come to you.

A free one-hour visit from a designer and a builder. Drawings and a line-by-line quote follow within a week.

What’s on your wish list?
Finish level
Day
Time

No pressure, no obligation. We’ll reply within one business day.

08 / Questions

Still
wondering?

We do. We prepare and submit the City of Phoenix permit, the HOA packet and the pool barrier paperwork, and we answer every follow-up. You deal with one team the whole way.

Ready when you are

Let’s make
a splash

One free consultation gets you a design, a firm price and a start date.